Working at Height — Checklist
Pre-use checks
- Ladders/steps inspected (stiles, rungs, feet, locking bars).
- Guardrails, toe-boards or collective protection in place where needed.
- Access equipment on firm, level ground; outriggers deployed if applicable.
- Weather conditions suitable (wind, rain, ice).
Controls / Method
- 3 points of contact on ladders; no overreaching.
- Harness & lanyard if required; suitable anchor points verified.
- Exclusion zone/barriers below; tool lanyards used.
- Rescue plan confirmed and communicated.
PPE (examples)
- Safety helmet (EN 397) with chinstrap.
- Safety footwear (EN ISO 20345).
- Cut-resistant gloves (EN 388) – task dependent.
- Fall arrest harness (EN 361) + lanyard (EN 354/355) if applicable.